HUSUM WIND

My Account

Language

HUSUM WIND Forum HUSUM WIND 2025

Balance of Plant (BoP) Optimization with Engineered Infrastructure Solutions

Implementing advanced and innovative solutions for BoP infrastructure such as access roads, working platforms or crane hardstands, can lead to significant time, cost and resource savings.

HUSUM WIND
25813 Husum, Germany

By improving the infrastructure of the project, stakeholders can reduce construction and
investment risks and ensure both short-term and long-term sustainability. Engineered
infrastructure solutions with polymeric geogrids address construction challenges and assure
a sustainable and advanced approach to building robust and safe BoP infrastructures for the future.

Speakers (1)

Daniel Cammarata Dipl.-Ing

Daniel Cammarata Dipl.-Ing

Technical Sales Manager DACH-LUX & Latin Europe

Participate

1 Participating
A
Show all

Key data

  • Tuesday, September 16, 2025
  • 12:30 PM - 12:50 PM
  • Hall 3, booth C25
Add to Calendar

Share event

Related topics (3)