HUSUM WIND

My Account

Language

Watt 2.0 Forum HUSUM WIND 2025

Feasibility study on heat supply in Wilster – focus on waste heat potential from SuedLink

The Wilster municipal utilities are planning to set up a central heating supply for parts of the town of Wilster.

HUSUM WIND
25813 Husum, Germany

The Wilster municipal utilities are planning to set up a central heating supply for parts of the town of Wilster. To this end, a feasibility study based on the municipal heating plan has been carried out in accordance with the BEW. The main potential was identified as the waste heat from SuedLink, which is to be brought to a usable flow temperature with the aid of a heat pump. This would enable SuedLink not only to make an important contribution to the distribution of renewable energies between northern and southern Germany, but also to play a significant role in the renewable heat supply in Wilster.

Speakers (1)

Yannik Schimmel

Yannik Schimmel

Stadtwerke Steinburg

Participate

Key data

  • Thursday, September 18, 2025
  • 4:30 PM - 4:50 PM
  • Hall 5, booth B36
Add to Calendar

Share event