Join us on an exclusive offshore excursion aboard the high-speed catamaran Halunder Jet, where we’ll visit up to 25 wind farm projects operated by industry leaders.
Full Speed Ahead: Offshore Wind Adventure on the Halunder Jet. Get to know the Halunder Jet – our high-speed catamaran for the offshore excursion on September 15!
In the SeaMe project, RWE is testing new ways to protect the seas. Drones, underwater robots, environmental DNA analyses, and AI cameras enable a gentle, holistic approach to marine monitoring.
Strong winds and high waves make the planned offshore excursion on 15 September 2025 impossible. For safety reasons, the date must be postponed.
April 24, 2025 marked the start of construction of the first turbine of the largest offshore wind farm to date “EnBW He Dreiht” with a total of 64 wind turbines - marking also the start of the critical phase of offshore work for 8.2!
Together with leaders from politics and industry, we celebrated the future of offshore wind – with great guests, visions and a special ticket giveaway!
Largest excursion of its kind in the European wind market in the past 15 years / Organised in cooperation with WAB e.V. and FRS Helgoline / Excursion offers exclusive insights into cutting-edge offshore technologies
Our floating LiDAR system is deployed offshore to collect wind and metocean data that supports the feasibility assessment of wind farms and critical decisions.
A game-changing offshore solution combining flexibility, efficiency, and low environmental impact — now in production and ready to redefine offshore wind maintenance.
Delivering sub-millimeter flatness for transition-piece and -tower flanges, showcased at HUSUM WIND 2025, 16–19 September 2025. As offshore wind turbines grow larger, achieving precise flange connections is increasingly critical