When 9 towers fall, new energy is released
In Reuth, 9 old wind turbines are being replaced by three modern Enercon E 160 turbines – sustainable, precise, and sensitive, partly in a water protection area. Experience how we implement dismantling, recycling, and new construction of infrastructure from a single source. Learn more now!
In Reuth (Rhineland-Palatinate), we have completed the dismantling of 9 old turbines for our client JUWI, creating space for three powerful Enercon E-160 turbines with a hub height of 166 m.
Sustainable implementation:
- 80 m high steel towers completely dismantled and the material returned to the raw material cycle
- Around 3,000 m³ of foundation material recycled on site and reused for paths and crane sites
- Use of steel plates as mobile construction roads and surface reinforcements – temporary, resilient, residue-free
Special challenge: Working in a water protection area – with specially adapted protective measures and close coordination with the authorities.
Parallel to the dismantling, we are constructing the complete infrastructure for the new turbines: roads, crane sites, and cable routes – efficiently planned and implemented from a single source.
👉 From the first step to the finished infrastructure – we are your partner for repowering that creates the future.
Krämer Bau – repowering starts with us.
Visit us at HUSUM WIND 2025 and experience how we implement repowering projects sustainably, precisely, and reliably.
🌐 Repowering » Krämer Bau
📍 Halle 1, Stand 1C08