Overbuilding of grid connections – The new Section 8a (3) EEG in practice
The obligation of grid operators to allow overbuilding of grid connections presents new challenges. In his presentation, our expert Dr. Michael Stopper will examine these issues in more detail
HUSUM WIND
25813 Husum,
Germany
How can the interests of all parties involved be taken into account? How can the banks' requirements for a ‘secure’ grid connection be met? And how can a wide variety of scenarios be taken into consideration?
Speakers (1)
