When 9 towers fall, new energy is released

In Reuth, 9 old wind turbines are being replaced by three modern Enercon E 160 turbines – sustainable, precise, and sensitive, partly in a water protection area. Experience how we implement dismantling, recycling, and new construction of infrastructure from a single source. Learn more now!

Krämer Bau GmbH
53539 Kelberg, Germany

In Reuth (Rhineland-Palatinate), we have completed the dismantling of 9 old turbines for our client JUWI, creating space for three powerful Enercon E-160 turbines with a hub height of 166 m.

Sustainable implementation:

  • 80 m high steel towers completely dismantled and the material returned to the raw material cycle
  • Around 3,000 m³ of foundation material recycled on site and reused for paths and crane sites
  • Use of steel plates as mobile construction roads and surface reinforcements – temporary, resilient, residue-free

Special challenge: Working in a water protection area – with specially adapted protective measures and close coordination with the authorities.

Parallel to the dismantling, we are constructing the complete infrastructure for the new turbines: roads, crane sites, and cable routes – efficiently planned and implemented from a single source.

👉 From the first step to the finished infrastructure – we are your partner for repowering that creates the future.

Krämer Bau – repowering starts with us.

Visit us at HUSUM WIND 2025 and experience how we implement repowering projects sustainably, precisely, and reliably.

🌐 Repowering » Krämer Bau
📍 Halle 1, Stand 1C08