HUSUM WIND

My Account

Language

Novelty HUSUM WIND 2025

Craneless Bearing Exchange

Replacing damaged main bearings is associated with high costs and long downtimes. Disassembling the entire rotor and drivetrain requires an expensive high-capacity crane, factory refurbishment, and reassembly by crane.

eolotec GmbH
Nürnberg, Germany

CBE enables crane-less rotor bearing replacement directly on the tower, regardless of weather conditions. The rotor and drive train remain stationary, supported by our specially designed devices. These devices safely transfer all rotor loads to the main frame. Our process allows reuse of all major components, even the bearing housing. Your turbine is back on the grid within 6 days. No pre or post preparation required.

Your contact person

Hélène Guillerm

Hélène Guillerm

Legal & Marketing

Share post

Related topics (3)